Berth No. 1 Rehabilitation

中文网页

Kinder Morgan/ Vancouver Wharves
Berth No.1 Rehabilitation
Vancouver, BC

CWA carried out the detailed design for rehabilitation of the lead and zinc unloading system. CWA designed a belt feeder replacement to the vibratory feeder on the ship unloader, as well as a new fully enclosed dedicated unloading conveyor system with an innovative horizontal seal that allows the ship unloader to travel while minimizing dust emissions generated from the transfer of material from the ship unloader to the dock conveyor.

Canpotex2