20 MW Cogeneration Plant

中文网页

Tolko Industries Ltd.
20 MW Cogeneration Plant
Armstrong, BC

CWA Engineers assisted Riverside (now Tolko) with the selection and installation of the major equipment for the 20 MW cogeneration plant at Armstrong, BC. The work included the dismantling and re-installation of a used 330,000 lb/hr 875 psig, 900 degree F. boiler proper, auxiliary equipment, building structure, a 20MW extraction, condensing turbine and air cooled condensers from existing plants in California. The scope of engineering included process integration, civil, structural, piping, materials handling, on-site construction engineering, and start-up assistance.

Tolko